Lake Wylie Recreation Park Updates

Construction Update - Friday, November 30, 2018:

  • County staff, along with contractor & design team, has verified the locations of the survey stakes along the perimeter of the project are within the approved limits of disturbance. 
  • The perimeter clearing limits have been re-checked for accuracy and have been verified correct.
  • Currently the logging crew is clearing a 50’ swath along the perimeter (and within approved limits).
  • Installation of double silt fence (erosion control fencing) began Thursday 11/29 and will take approximately a week to install.
  • Logging within the perimeter and sediment basin areas will continue – expect logging trucks exiting the Park (approximately 6 trucks per day for the next 5 to 7 days) during this scope of work. There will be additional logging traffic as the balance of the clearing and grading operations progress on site.
  • Below is the plan of 1st phase of approved clearing and erosion control measures. Download a PDF copy here:
From Approved Set L501 PH1_ESC_jpeg